Skip to main content
0493 464 455

© Cost2Build.

Built By Getmilk.

Cost2Build Estimating

Pricing

Estimating Projects from New Homes to Unit Developments, Town Houses, Renovations & Extensions.

Estimate Option 1

Preliminary Cost Estimate (Owner Builder Recommended)
  • based on industry unit rates & historical data from previous jobs with similar building specifications.
  • job & construction stage percentages are very helpful in understanding what areas of the project are least & most expensive. This allows you to seek alternative options in order to reduce costs.
  • this estimate will give you a guide to understanding the value of your building project & the opportunity to readjust your building design before finalising, and set a realistic budget.
  • This estimate is set to a standard ‘Builders Range’ level (specification) of finishes & fixtures.

Estimate Option 1

Services Cost Specifications

  • Singles, Options 1&2 – Up to 300m2 of Building Area, ‘M’ Class Concrete Slab, Up to 500mm Fall Across Site, Truss Roof Frame, Excludes Pools & Any Other Free Standing Buildings/ Structures
  • Doubles, Options 1&2 – Up to 600m2 of Building Area, ‘M’ Class Concrete Slab, Up to 500mm Fall Across Site, Truss Roof Frame, Excludes Pools & Any Other Free Standing Buildings/ Structures

All Other Service Cost Specifications will be quoted Independently as POA (Price On Application)

Estimate Option: 1 – Preliminary Cost Estimate

  • 1 x 1 Level: $900
  • 1 x 2 Level: $1500
  • 1 x 3 Level: POA (Price on Application)
  • Multi Unit Developments & Renovations/ Extension projects – POA (Price on Application)

    Completion Time Frames

    Our typical turnaround times for our building estimates as follows;

    • 1 x 1 Level: Up to 5 Business Days
    • 1 x 2 Level: Up to 9 Business Days
    • Note – These time frames apply from the clearance of the deposit payment & may vary during peak periods or on more complex projects.

    Material TakeOffs

    • Same costs & conditions as above for Estimate Option 1.

    What file format will you receive your Building Estimates in?

    All Building Estimates & Material TakeOffs will be sent to you in a PDF file format for easy download.

    Estimate Option: 2

    Detailed Cost Estimate (Builder Recommended)
    • the Bill Of Quantities gives a high & itemised level of detail which is site specific to your project.
    • this level of information allows you to manage your project confidently, as well as cross-checking any quotes you receive from tradespeople.
    • job & construction stage data analysis are very helpful in understanding what areas of the project are least & most expensive. This allows you to seek alternative options in order to reduce costs.
    • this estimate will give you a guide to understanding the value of your building project & the opportunity to readjust your building design before finalising, and set a realistic budget. 
    • This estimate is set to a standard ‘Builders Range’ level (specification) of finishes & fixtures, but can be adjusted to a medium-high level on request.

    Estimate Option 2

    Services Cost Specifications

    • Singles, Options 1&2 – Up to 300m2 of Building Area, ‘M’ Class Concrete Slab, Up to 500mm Fall Across Site, Truss Roof Frame, Excludes Pools & Any Other Free Standing Buildings/ Structures
    • Doubles, Options 1&2 – Up to 600m2 of Building Area, ‘M’ Class Concrete Slab, Up to 500mm Fall Across Site, Truss Roof Frame, Excludes Pools & Any Other Free Standing Buildings/ Structures

    All Other Service Cost Specifications will be quoted Independently as POA (Price On Application)

    Estimate Option: 2 – Detailed (Bill Of Quantities)

    • 1 x 1 Level: $1500
    • 1 x 2 Level: $2200
    • 1 x 3 Level: POA (Price on Application)
    • Multi Unit Developments & Renovations/ Extension projects – POA (Price on Application)

      Completion Time Frames

      Our typical turnaround times for our building estimates as follows;

      • 1 x 1 Level: Up to 5 Business Days
      • 1 x 2 Level: Up to 9 Business Days
      • Note – These time frames apply from the clearance of the deposit payment & may vary during peak periods or on more complex projects.

      Material TakeOffs

      • Same costs & conditions as above for Estimate Option 2.

      What file format will you receive your Building Estimates in?

      All Building Estimates & Material TakeOffs will be sent to you in a PDF file format for easy download.

      Other Services

      Estimator Training/ Hire/ On Site Measuring

      • $90 per hour (min 4 Hours)
      • Travel Surcharge: POA

      Other Service Costs

      The following services are priced on a POA (priced on application) basis only.

      • Custom Quotation Sheets for Builders & Tradespeople
      • System Development Services (Creating or rebuilding your estimating systems)
      • Cost Reduction/ Options Reporting

      Information Required for Building Estimates

      We recommend you provide as many of the following ‘Permit Stamped’ documents as possible in order to increase the level of accuracy of your Building Estimate.

      • Building Permit Plans  
      • Structural Engineering Design
      • Feature Site Survey
      • Soil Report 
      • Energy Rating Report
      • Windows/ Door Schedule
      • Specifications, Fittings & Fixtures Schedule

      More Information

      Building prices may vary considerably depending on a number of factors such as:

      • Extent, accuracy & level of information you provide to us.
      • Choice & quality of building materials
      • Quality & workmanship of Builders & Tradespeople selected
      • Extent of client involvement
      • Method of construction
      • Site accessibility & restrictions
      • Size of job: larger works can achieve a better value price per square metre
      • Quality of job required, for example volume built vs custom built projects can vary considerably in cost
      • Project location: inner city, regional/rural areas & areas close to water tend to attract a premium price

      Please Note – The costing information contained within our building estimates are based on average industry standard rates. We recommend this information to be used as an informative budgeting guide.

      Payment Terms

      • Deposit: 50% – Before Starting Work
      • Final: 50% – Before Releasing Work

      Note – GST does not apply to our services.

      Why Choose Us?
      With 2 decades of experience, accurate, tailored costing solutions and expert support help manage budgets and achieve successful construction outcomes efficiently and confidently.